Had gotten the last two rolls of wire needed to finish off the south line fence a couple weeks ago. But temps in the high 80's and mid 90's stoped me from doing the labor to install it.
Monday I took 330 foot roll to the area and spliced it into the end of the last installed 330 feet. Just spliceing the wire got me soaking with sweat by the time I had finished.
Thankfully rolling it out is a easy job useing the bucket on the Bota. I am really surprized how easy it does roll out untill about the last 25 feet or so.
To hot to do the last 330 feet plus need to call miss dig about marking any under ground wires where the end brace post will go.
That should keep my girls from the swimming pool next door.
Al